Construction Update

September 2015

These are some of our latest pictures. Paint is finished, tile almost finished, gate and security grill installed, electric is in and working. The water tower is complete and the tank is on the property (only need the pump now).

Praise the Lord! Our landlady (from our Nairobi apt) has provided us with furniture, bedding (to sleep up to 9), and curtains for the Team/Training House. We will be ready for Teams shortly!

Front Gate to the property

Front Gate to the property

Front of the Team/Training House

Close up of front balcony

Close up of front balcony with security grill.

..

First floor stairwell

unnamed (9)

Stairwell window

Top view of stairwell

Inside front door

Inside front door

Inside main floor

Inside main floor

Ric at the Kitchen archway

Ric at the Kitchen archway

.

Bathroom tiles

Preparing plywood and 1X4’s for English Tutor trim

.

.

.

.

Ric teaching Joseph, James, and Peter.

.

.




July 2015

Pictures showing progression in work done for the water tower, and future water tank.

First level columns of the water tower.

Work continues on the water tower

Second level of the water tower.

Water tower second level completed

The water tower will have three levels and go up 24 feet to the bottom of a 2550 Gallon tank.

Water is a real need and part of our ministry.

Water is a real need and part of our ministry. Meeting the needs of the community.

Drawing water from the well to be used for mixing the cement.

Mixing the cement

Mixing the cement

Working on the steel for the water tower.

Interior work on the walls, floors, and partitions of the Team/Training House.

Plastering of the walls.

Plastering of the walls.

Finished plastered walls, ready for the floors.

Finished plastered walls.

Plumber hard at work

Plumber hard at work

Ric and the Plumber lay pipes in the subfloor.

Ric and the Plumber lay pipes in the subfloor.

Stones laid as the Subfloor, ready to pour the concrete.

Stones laid as the Subfloor, ready to pour the concrete.

Finished floor of the large room downstairs.

Finished floor of the large room downstairs.

Beginning of partitions in the small rooms.

Beginning of partitions in the small rooms.

Partitions upstairs

Partitions upstairs

Walls in the toilet area.

Walls in the toilet area.

Progression of the partitions

Progression of the partitions

Archway partition

Archway partition

Finished archway

Finished archway

Finished interior walls

Finished interior walls

Upstairs living area

Upstairs living area

Kitchen archway

Kitchen archway




June 2015

Hard work digging (by hand) the Hole for the platform of the Water Tank Tower.

Hard work digging (by hand) the Hole for the platform of the Water Tank Tower.

We now have Electricity going to the Team/Training House!! You can see the fuse box outside, and we now have inside outlets!!

We now have Electricity going to the Team/Training House!! You can see the fuse box outside, and we now have inside outlets!!

Left is Prince age 4 (Mary and Paul's son). Right is Favor age 5 (Patrick and Lucy's son). They are great friends in school and enjoy playing all the time!

Left is Prince age 4 (Mary and Paul’s son). Right is Favor age 5 (Patrick and Lucy’s son). They are great friends in school and enjoy playing all the time!

Pastor Patrick's wife, Lucy, Drawing water

Pastor Patrick’s wife, Lucy, Drawing water

june-102015-tt-house-011

The work of plastering the ceiling has begun! All the walls must be plastered before painting, and then work will focus on the concrete floors.




October 2013

Here are some of the final construction pictures of the Team/Training House in  rural Kakuyuni, taken during our recent 3 1/2 month mission trip.

We were able to completely enclose the House with windows and doors before returning to the U.S.

The House is ready for final completion when we return to Kenya, and when the needed funds are available.

Thank you for your continued prayer for completion of the House, as we are excited to see the Lord’s ministry grow, right in the heart of the Kenyan people.

October 16th House

October 16th: Front Door of the Team/Training House

October 16th: The Team/Training House enclosed with windows and doors. See our recent newsletter for a more detailed description of our work on the house and our continued ministry.

The Children of Kakyanuni watching construction of the Team/Training House

The Children of Kakyanuni watching construction of the Team/Training House     

Oct 4th 2013 Windowsills 001

Side of the House after Window and Sill installation

October 5th: Window Sills

Stone Window Sills cut and shaped by hand

October 4th

Finished stone work and arch on the upstairs balcony

Window Glass detail seen in the large Stairway Window

.

Before completion of the Window Sills

Classroom

Future Room for Bible Studies, Fellowship, and Seminars

Future Housing for Ministry Teams from the U.S.

October 16th: Front Gate

Front Main Gate Posts

Stone being handfaced by chiseling

Stone being handfaced by chiseling

October 16th

Ric at the Personal Gate Post




August 2013

The roof is now completed on the entire house and here are some of the pics. We don’t have a good view from the front of the House because of the mango trees. 

We are now ready for the Windows and the Doors. We believe the Lord will provide the needed funds to finish the House (full amt is required to order the windows and doors) this year.

Completed Roof

Finishing installation of 1100 sq ft of clay tiles on 2nd floor

Finished Front Porch and Upstairs Balcony

August 30th
Close up of the Balcony showing the concrete ring beam  

Finished roof August 24 2013

Finished Roof August 24 2013

 

AUGUST 17 2013

House Front (Awaiting Doors & Windows) August 17, 2013

AUGUST 17 2013

Second Level Roof Completed ,August 2013

Roof construction Aug. 1,2013

Roof construction Aug, 2013

Roof construction Aug. 1,2013

Roof construction Aug, 2013

Roof construction Aug. 1,2013

Roof construction Aug, 2013

Roof construction Aug. 1,2013

Roof construction Aug, 2013

Roof construction Aug. 1,2013

Roof construction Aug, 2013

Roof construction Aug. 1,2013

Second Level Roof construction Aug, 2013

Roof construction Aug. 1,2013

Second Level construction Aug, 2013

Roof construction Aug. 1,2013

Construction Aug, 2013

The Stairwell here is now completed

The Stairwell here is now completed






Video from our Fall 2012 Trip

Video of construction work (using our favorite pics and video) during our Fall 2012 trip. Enjoy as you watch the Lord’s work, fulfilling the vision for ministry in the heart of the Kenyan people.

Fall 2012

View of the front archway entrance of the House

The back of the Team/Training House

Finished tile roof on lower section of the House

Ongoing preparation and planing

Ric instructing the workers

Inside the lower level

Workers joining efforts on the Team/Training House

Workers continue plans to prepare for the roof

Ric overseeing construction to finish Phase 2






September 24, 2011

First level of the Teaching/Training House

     These photos show the construction that was completed this fall on the Teaching/Training House and the septic system.  The walls of the Teaching/Training House are now up to the top of the windows. The jack arches are over the windows and doors. We are now ready for the concrete ringbeam and the roof. 

     Ric continues to teach the local workers “hands on” constructions skills and basic principles as work on the project continues.

 

Sewage plans

Pastor Zach sees the never ending potential for ministry once this phase of the project is done.

Salem looking at the front side of the Teaching/Training HouseThe team from Salem joined us this fall and visited the project site.

 





October 1, 2010

These photos show the work progress that was made prior to the Taylor’s returning to the states. Phase 2 is complete up to the finished grade so that Ric and the teams can begin working from the floor up when he returns to Kenya in late February.

Looking from the road up to construction site

Looking down from the storage building toward the construction site

September 2, 2010

On Thursday, September 2, Ric took James and Pete with him to Kakuyuni to the construction site. The footers had been dug and the building materials had begun to arrive. Ric taught the village men whom he had hired the art of making a uniform concrete mix and how to make a continuous pour using bulkheads. They quickly got the hang of things and the footers were poured in a little more than a day. Once the footers were poured, the men set to work finishing the digging of footers for the Teaching/Training House, so that they could begin pouring them on Monday, September 6.

Ric directs Pete and James as they level the footings for the Teaching/Training House.

Sammy, our mason, making sure the pour is smooth for the foundation of Phase 2

Our “fundi” or craftsman working on facing the stone

Ric first had to teach the laborers how to mix concrete.

Richard supervising the advance work for the foundation

James holds the stick for Ric to use the laser level.